2050 METROPOLITAN TRANSPORTATION PLAN

Answers to questions that have been recieved by the MPO in reposnse to the Request for Proposals for the preparation of the 2050 MTP can be found by following this link: 

THAMPO 2050 MTP REQUEST FOR PROPOSALS - QUESTIONS AND ANSWERS

The Terre Haute Area MPO is soliciting proposals from qualified consultants to prepare the Metropolitan Transportation Plan for the Terre Haute Metropolitan Planning Area. To view the Request for Proposals (RFP) click the following link: 

REQUEST FOR PROPOSAL: TERRE HAUTE AREA MPO METROPOLITAN TRANSPORTATION PLAN (2050)

Proposals shall be governed by the following estimated schedule:

  • October 17, 2022 – Publication of Request for Proposals
  • October 28, 2022 – Deadline for Submission of written inquiries
  • November 4, 2022 – Response to inquiries posted
  • November 18, 2022 – Written proposals due at Terre Haute Area Metropolitan Planning Organization
  • November 28, 2022 – Interviews of selected respondents via Microsoft Teams
  • November 30, 2022 -Selection of consultant and initiation of contract negotiations

Detailed scheduling of the project will be negotiated during the contract negotiations by the selected CONSULTANT and the MPO. The date for initiation of the contract as well as the overall contract performance period will be negotiated with the selected CONSULTANT based on the tentative time schedule listed below.

  • Notice to Proceed – December 19, 2022
  • Proposed Fiscally Constrained Plan – January 5, 2024
  • Draft Report to THAMPO Transportation Technical Advisory Committee – April 1, 2024
  • Draft Report presented to THAMPO Transportation Policy Committee – May 21, 2024
  • Final Report to Transportation Technical Advisory Committee for Review – June 11, 2024
  • Final Report to MPO – July 16, 2024
  • Final Report to THAMPO Transportation Policy Committee – July 23, 2024
  • Complete Study – September 24, 2024

RFP Inquiries should be directed to:

Jeremy Weir, Director of Transportation Planning
Terre Haute Area MPO
630 Wabash Avenue, Suite 221
Terre Haute, IN 47807
(812)244-1319
jweir@terrehauteedc.com 


2045 Metropolitan Transportation Plan

The MTP identifies the long-range strategies and actions to be carried out over the next 20 years for contiured development of the integrated multimodal transportation system in the West Central Indiana Metropolitan Planning Area (MPA). Development of the plan is a cooperative effort between the MPO, local officials and stakeholders, the state department of transportion, and the public. The current plan, which was adopted by the Transportation Policy Committee on Sep 28, 2018, is based on available estimates and assumptions through 2045 for population, land use, travel, employment, congestion, economic activity, and funding.

Click here to download the 2045 Metropolitan Transportation Plan (MTP) [3.4 mb PDF]